Finishing:
odds and ends |
Jane putting the last coat of poly
on the base, door and window trim |
 |
Bifold door frame is in.
The interior doors and all trim is stained in the hangar area. |
 |
Insulating the hangar with
Urethane foam and 6" bats |
 |
Water, phone, and computer
network cables were run from the house to the new building in a single
trench. |
 |
3 flexible water lines were
inserted into a 3" field tile. This way additional
communication lines can be pulled in later without digging. |
 |
The water lines were a tight
fit...ask Jerry and Paul. |
 |
The plastic is in and ready for
backfill. |
 |
Paul putting together the main
heating trunk line in the lab... |
 |
We will really appreciate the heat
in a few months! |
 |