| |
Excavation
and Footings |
Before construction started, the existing concrete slab
was cut and sections removed to make way for the new footings. |
 |
Digging the footings... |
 |
Yes, Andy (age 9) really did dig this section of the trench. |
 |
The concrete arrived 10 minutes before the rain. |
 |
Ready for re-bar |
 |
Second load going in |
 |
Leveling and placing re-bar |
 |
|