| Excavation
and Footings |
| Before construction started, the existing concrete slab
was cut and sections removed to make way for the new footings. |
 |
| Digging the footings... |
 |
| Yes, Andy (age 9) really did dig this section of the trench. |
 |
| The concrete arrived 10 minutes before the rain. |
 |
| Ready for re-bar |
 |
| Second load going in |
 |
| Leveling and placing re-bar |
 |
|