Sidewalks
Tim left on on a business two-day trip, and Kris decided to get the walks done while he was gone.  The crew formed the porch and sidewalks in a single day... HPIM1223.JPG (1261012 bytes)
...and poured them the next.  Tim should take business trips more often. HPIM1227.JPG (1292948 bytes)
Southeast entry... HPIM1237.JPG (1154612 bytes)
Southwest entry... HPIM1245.JPG (1308340 bytes)
Now that the steps have set up a bit, they can finish the main walk. HPIM1251.JPG (1219764 bytes)
Stamping the brick design... HPIM1255.JPG (1033492 bytes)
Coloring and stamping the gray center... HPIM1256.JPG (1407412 bytes)
Continuing the pattern... HPIM1258.JPG (1338036 bytes)
A nearly finished product, just add the brick color! HPIM1261.JPG (1475988 bytes)

  

 