Lab and Office Framing
Walls are up and joists nearly complete.  

 

HPIM0848.JPG (1690548 bytes)
By the end of the next day, the subfloor was complete.   The hole is for the stairway between the lab and office areas. HPIM0850.JPG (2000980 bytes)
View from the North side HPIM0853.JPG (1965652 bytes)
...and from the Southeast. HPIM0858.JPG (1584916 bytes)
Conference room window being framed HPIM0860.JPG (1411444 bytes)
Office walls going up HPIM0861.JPG (1114452 bytes)
Finished wall height HPIM0866.JPG (1290004 bytes)
More bracing will be placed before cement. HPIM0867.JPG (1369780 bytes)
An "inside cut-away" view... HPIM0869.JPG (1279316 bytes)
Ready to start pouring. HPIM0871.JPG (1178580 bytes)
A view from upstairs HPIM0880.JPG (1119540 bytes)
Cement filled, leveled, and bolts inserted. HPIM0884.JPG (1370516 bytes)

  

 